Friday, 26 June 2015

Evaluation- pre-production.

The first task we attempted to complete after being assigned into our group and given the video we were told to re-create, was to delegate roles. The roles we needed were band members (singer, guitarist, drummer and bassist) and director, cameramen and gaffer/best boy. It became apparent that all of the roles other than the acting could be merged into a communal role within which me, Sachin and Jordan shared responsibility for together. We then began to storyboard after Joe and Louis sourced the drama room for filming and assured the instruments in music were free for us to use. On the day of filming we constructed a small stage for the drum kit and then also assembled the drums and put everything into position including lighting.

No comments:

Post a Comment